The Development
During its operational life (about 40 years), the development would provide capacity to store up to 100 megawatts (MW).
Image shows provisional layout.

Landscaping
Extensive planting will be integrated into the development to enhance both the landscaping and ecological value of the site. This will provide natural screening and significantly increase biodiversity. The planting plan includes a variety of shrubs and trees, leading to an improvement in habitat units, further enriching the local environment.
Image shows Illustrative Landscape Masterplan.

Components of the proposed development include:
- Bespoke battery energy storage containers
- Transformer stations
- A 132/33kV switchyard
- A welfare building
- Customer facilities, including:
- A control building
- A switch room
- A store building
- Distribution Network Operator (DNO) facilities, including:
- A control building
- A metering room
- A store building
- Visitor car parking spaces
- Light and CCTV poles
- A perimeter fence (likely to be palisade and / or weldmesh in construction)
- Attenuation ponds
- Landscaping and biodiversity areas
To learn more about the components and their function visit the FAQ page.